Spectra-precision Survey Pro v3.80 Recon iPAQ Reference Manual Manual do Utilizador Página 155

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 261
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 154
Stakeout Menu
R-149
Store Offset Points – Screen Three
The third Store Offset Points screen is used to define which offset
points will be stored.
From Station
: is the station where the stored offset
points will begin.
To Station
: is the station where the stored offset points
will end.
Station
Interval
: is the distance between the stations
where offset points are stored.
Note: If the
Stake Corners
option is selected in the
Stakeout Settings screen, offset points will also be
stored where ever the horizontal or vertical section of
the road changes.
Start
Point
: is the point number that will be assigned
to the first offset point that is stored. Each stored
point that follows will be assigned the next available point number.
Description
: is the description that will be assigned to all the offset
points that are stored.
Center
Line
: offset points will be stored at locations on the
centerline when checked.
Edge
of
Pavement
: offset points will be stored at the end of the
first segment (the edge of the roadbed) on the left and/or right side
when checked.
Curb
: offset point will be stored at the end of the second segment
(the end of the curb or ditch) on the left and/or right side when
checked.
: quickly unchecks all the checkboxes.
: returns to the previous screen.
: stores all the offset points based on the information provided.
Vista de página 154
1 2 ... 150 151 152 153 154 155 156 157 158 159 160 ... 260 261

Comentários a estes Manuais

Sem comentários