Spectra-precision Survey Pro v3.80 Recon iPAQ User Manual Manual do Utilizador Página 77

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 178
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 76
Fieldwork
69
d.
For this example, simply accept the default
job settings and tap .
Note: When creating a new job, it is important that
the
Units for Distances
field be set to the correct
units. This allows you to seamlessly switch between
different units in mid-job.
Problems can arise if these units are inadvertently
set to the incorrect units prior to entering new data.
For example, assume you created a control file by
hand-entering a list of coordinates in a new job
where the job was set to
Feet
and the coordinates
were in
US Survey Feet
. Now assume you created
another new job and correctly set it to
US Survey
Feet
. If you then selected the previous job as a control file for the new
job, the display of all of the coordinates in the control file would be
converted from Feet to US Survey Feet.
Vista de página 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 177 178

Comentários a estes Manuais

Sem comentários