Spectra-precision Survey Pro v4.5 Ranger Reference Manual Manual do Utilizador Página 17

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 475
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 16
File Menu
R-9
Next > : opens the next screen. The screen that opens depends on if
a control file will be used.
Create a New Job 2 – (Imported or
External Control File)
This screen will only open next when a control
file will be used or imported.
Import Control Points: When selected, the
points in the control file will be imported into
the new job.
Use External Control File: When selected, the
control points in the control file will be
accessible from the new job, but will not be
imported.
Control File: displays the path and control file
name selected with the Browse… button.
Browse… : will open the Open screen (Page R-
13) where an existing job can be selected as a
control file.
< Back : returns you to the previous screen.
Next > : opens the next screen.
Vista de página 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 474 475

Comentários a estes Manuais

Sem comentários