Spectra-precision Survey Pro v4.5 Ranger Reference Manual Manual do Utilizador Página 324

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 475
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 323
Survey Pro Reference Manual
R-316
Store Offset Points
Stakeout Store Offset Points.
The Store Offset Points screen is used to store points in the current
job at a specified offset from an existing polyline or alignment at a
specified interval.
Tap Line… : allows you to tap an existing
polyline or alignment that the station and
offset will be computed from.
To/From… : Opens the Point List screen (Page
R-443) where a point list can be created.
Begin Station: is the station assigned to the
beginning of the line.
Next > : takes you to the next Store Offset
Points screen where the slope staking
parameters are set up.
Store Offset Points – Screen Two
The second Store Offset Points screen is used
to define the road profile, or offset distances
that will be used to compute the offset point
coordinates.
1/2 Road Width: is the Left and Right width
of the road, respectively, from the centerline to
the edge of payment.
X-Slope (%): is the Left and Right slope of the
road, respectively, from the centerline to the
edge of payment calculated from
100
Run
Rise
.
Vista de página 323
1 2 ... 319 320 321 322 323 324 325 326 327 328 329 ... 474 475

Comentários a estes Manuais

Sem comentários